First DOM115 Baglietto moved the Carrara shipyard

19/11/2024 - 16:01 in Superyacht by Baglietto

Just a few days ago, the first hull of the DOM115 line was moved to Baglietto's Carrara shipyard, where fit-out activities will be carried out, preparing the yacht to be delivered to her Owner in 2025.

This thirty-five-metre steel and aluminium vessel – the entry level of the DOM line designed by Stefano Vafiadis – retains the stylistic features that made the success of her larger sistership, preserving her contemporary, captivating lines and emphasizing her sporty, dynamic character even more.

Just like the DOM133, this model too stands out for truly impressive volumes, unparalleled on the market. The large, panoramic glazed surfaces on the main deck let in plenty of natural light and enhance the harmonious ensemble of interiors smoothly flowing into exteriors to create one single uninterrupted space, also thanks to the fully opening sliding doors. Similarly, the living room/veranda on the upper deck has large windows that open up on three sides, in seamless connection with the surrounding nature.

The aft area develops over three levels that gradually descend towards the pool overlooking the sea, while the tender can be stored in the side garage, thereby removing any obstacles from the deck.

The next available hull will be ready for delivery in March 2026.

Copyright © 2022 Pressmare All Rights Reserved