New Zealand-based testing program at Whenuapai Air Base, week two

31/05/2022 - 07:43 in Sport by Emirates Team New Zealand

A big thanks to the RNZAF for being so accommodating and thank you also to our own Landspeed team for their great work in helping make the testing and commissioning efficient and accurate.

We have sailed up to 148kmph and put the craft through some punishing testing in shifty, gusty breeze and Horonuku came through with flying colors. It is clear to me that this craft is ready to stretch her legs and take a big breath of air.

The feeling I have in the cockpit every time I air brake the wing and stand on the disc brakes as the end of the tarmac approaches at speed, is one of surrealism. Knowing that in a couple of months time (when we arrive at Lake Gairdner), there will be no braking, no tarmac and no boundaries.

This final week of Horonuku based in NZ will see it de-rigged, disassembled, cleaned, serviced and packed up on its trailer, loaded into a container with equipment and spare parts, ready for shipping to Australia.

The container doors will be shut on Friday bringing to a close the first two phases of the project. The design/build and NZ based commissioning and testing is done

I very much look forward to a successful Phase 3 of this project!

 

Copyright © 2022 Pressmare All Rights Reserved